News

April 16, 2024
  •  At Yallourn, units 1, 2 and 4 are online and running.  Unit 3 remains offline for repairs.  
  •  At Mt Piper, both units are running.
  •  EnergyAustralia’s gas asset at Tallawarra A ran from the afternoon. Jeeralang was online in the evening.  Hallett, Tallawarra A, Newport and Jeeralang are available for market requirements today.
  •  Tallawarra B, EnergyAustralia’s new gas-peaking power station, is continuing pre-commissioning works and testing.